News & Articles: Articles

ARTIC WIN- SOUTH LONDON AND MAUDSLEY HOSPITAL

Artic have regained the Planned Preventative Maintenance Contract to the air conditioning and ventilation systems at South London and Maudsley Hospital (SLaM). The contract spans over 3 sites, (Bethlem Royal…

Read More

Reducing Carbon Emissions in the NHS

Hospitals face massive pressure on staffing, resources, budgets and hygiene – and now they are facing the increasing challenge of having to reduce carbon emissions. As a Facilities Manager you’re…

Read More

FIX OR REPLACE?

As your plant ages, complications inevitably arise as malfunctions occur. Broken machinery and outdated systems can cause disruptions to your business, potentially creating unwanted equipment downtime and high maintenance costs.…

Read More

WHY TECHNOLOGY AND THE OPTIMISATION OF HVAC SYSTEMS WILL BE KEY IN THE FUTURE…

With the UK aiming to end its net overall contribution to global warming by 2050, buildings are under increasingly thorough investigation to uncover and implement ways of improving internal efficiencies.…

Read More

ZOOMLOCK – PROJECT MANAGER LEE RUMBLE REVIEWS THE PROS AND THE CONS

ZoomLock is a tool for connecting pipework using a simple crimp design. It is a press-fit system that eliminates the need for brazing, offering a safe method of joining pipes.…

Read More

WHAT WILL IT TAKE TO BECOME A SMART ORGANISATION?

As technology becomes more advanced, the Facilities Management industry is experiencing a significant transformation of its practices, processes, and systems. Facilities Managers face profound changes and must adapt to working…

Read More

SIMPLE STEPS TO FIRE & SMOKE DAMPER COMPLIANCE

The Building and Engineering Services Association (BESA) has released the latest guidance concerning Fire and Smoke Damper Maintenance, called VH001. It has been designed to inform BESA members of specific…

Read More

Service of Excellence Awards

Artic would like to extend a congratulations and big thank you to Lewis Ellis, Glen Shaw and John Bull on receiving a Service of Excellence award for their hard work…

Read More

WHAT IS THE FUTURE FOR FM REQUIREMENTS IN THE NHS?

It is estimated that the NHS may take a year to fully recover from the pandemic. Due to the coronavirus, millions of people avoided going to the hospital despite needing…

Read More